So with the floor down, the internal partitions can start to take shape, starting with those that define the shape and size of the future stair. With these in place the final detailed design and fabrication of the stair can begin...!
1 Comment
Concrete pours are always stressful and this was no exception, although we got a nice technical rep. in to support us with the Self Compacting Concrete (ie self-levelling - magic!) as a promotional freebie, the lorry was late and almost got stuck the wrong side of a parked car... But once cured the concrete will form a solid, flood resisting floor that will add to the thermal mass of the building, smoothing temperature fluctuations. The concrete came with steel fibre reinforcement (chopped up wires) that meant we didn't need a reinforcing steel mesh, saving time, money and aggravation (and injuries!). |
AuthorMike Hawkins is a co-op member and is responsible for the design and management of the build. He'll also live in it when its finished - hooray! He teaches future architects at Leicester DeMontfort and Birmingham City universities. Archives
November 2017
Categories |